Full text: BeJamDetect Project

Final Report of BeJamDetect Project 
L5 band, Input power at central array element 
PO EEE PS EEE DS 
1 TI 
kr — APin at Ant#7 (dBm} 
Mama een 
D2:00:00 04:00:00 06:00:00 08:00:00 10:00:00 12:00:00 14:00:00 16:00:00 18:00:00 20:00:00 22:00:00 
UTC time, t0 = 16-0ct-2023. 00:00:00 Oct 16, 2023 
wm 
Figure 5-19 - Input power on top antenna element on October 16 in L5 band 
It was an isolated event and caused the loss of tracking of some satellites and even caused 
degradation on the C/NO levels of most L1 signals coming from the same satellites, as shown on 
Figure 5-20. These impacts were caused by a very wideband pulse that covered the whole 50 MHz 
spectrum (and possibly more) with a waveform similar to a noise-like signal. 
User positır 
4 1 - 
ic C 
En EL 
LE A 
DAN ADB 
SEE A 
DIE AIR MEET 
Yıl Sa 16-10-2023 
DT dd SA 
Ye 
Ya 
ä 
reN. 
m 
‚IN 
"a, 
Figure 5-20 - GUI snapshot at the moment of very strong RFI in L5 on October 16 
Given its isolated occurrence in time and space (moored in the Unterwarnow cannal, see Figure 
5-21), and the waveform, the most probable cause was an electric surge or spark in the system 
that affected the antenna chains in this frequency. 
Fitle: Final Report 
Version: 1.0 
age: 90
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.