In the plots it is possible to spot a discontinuity on the input power of the recordings between
August and September. It was caused by an electric power fluctuation on-board of the ship, which
made the Demonstrator’s system to shut off automatically for safety. During the period between
August 20 and September 4 Demonstrator 3 did not record data.
The temporal distribution of the RFI detections in L1 and in L5 are respectively reproduced on Figure
5-9 and Figure 5-10.
f[emporal distribution of detections in the L1 band with respect
to the AP;.,., In 2023
‚40
L20
LOO
30
50
10
»0
)
August
September October
November
M Strong RFI | 5 < APin [dB]
1 Weak RFI | 1 < APin < 3 [dB] EM Medium RFI | 3 < APin <5 [dB]
Figure 5-9 - Temporal distribution of RFI detections in the L1 band in 2023
Temporal distribution of detections in the L5 band with respect
to the AP;.,., In 2023
250
200
150
100
50
October November
a Weak RFI | 1 < APin < 3 [dB] ME Medium RFI | 3 < APin < 5 [dB] M Strong RFI | 5 < APin [dB]
rigure 5-10 - Temporal distribution of RFI detections in the L5 band in 2023