Final Report of BeJamDetect Project 
Z 
Yolr 
In the plots it is possible to spot a discontinuity on the input power of the recordings between 
August and September. It was caused by an electric power fluctuation on-board of the ship, which 
made the Demonstrator’s system to shut off automatically for safety. During the period between 
August 20 and September 4 Demonstrator 3 did not record data. 
The temporal distribution of the RFI detections in L1 and in L5 are respectively reproduced on Figure 
5-9 and Figure 5-10. 
f[emporal distribution of detections in the L1 band with respect 
to the AP;.,., In 2023 
‚40 
L20 
LOO 
30 
50 
10 
»0 
) 
August 
September October 
November 
M Strong RFI | 5 < APin [dB] 
1 Weak RFI | 1 < APin < 3 [dB] EM Medium RFI | 3 < APin <5 [dB] 
Figure 5-9 - Temporal distribution of RFI detections in the L1 band in 2023 
Temporal distribution of detections in the L5 band with respect 
to the AP;.,., In 2023 
250 
200 
150 
100 
50 
October November 
a Weak RFI | 1 < APin < 3 [dB] ME Medium RFI | 3 < APin < 5 [dB] M Strong RFI | 5 < APin [dB] 
rigure 5-10 - Temporal distribution of RFI detections in the L5 band in 2023 
Fitle: Final Report 
Version: 1.0 
age: 81
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.