Skip to main content

Full text: BeJamDetect Project

Final Report of BeJamDetect Project 
Time evolution of PRNs in PVT and in track 
„| 
ULM 
3 F ; 
a| 
W 
3 
A 
Aa 
N 2 3 
14-Jan 
UTC time 
I 
“ 
A 
ya. 
Il 
wahr 
7 
Jal 
we 
— sed for PVT 
— tracked, GPS L1-C/A | 
tracked. GA =1-BR 
1 * 
‚an 
2022-2023 
Figure 4-42: Number of GPS L1-C/A signals being tracked and used for PVT, January 2023 
Time evolution of mean CNO values 
GPS | 1-C/A 
DAL E1-B 
50 
15 
r 
340} 
) 
35 L 
un 
IE 
37-.1an 
14-Jan 
UTC time 
21-.lan 
28-Jan 
2022-2023 
Figure 4-43: Mean C/NO value for GPS L1-C/A signals, January 2023 
4.1.5. Interference situation in February 2023 
The selected test metrics are presented in Figure 4-44, Figure 4-45 and Figure 4-46. The time 
periods with increased interference activity are marked in Figure 4-44 with red boxes. 
After the fixing the issue with the failed 5V power supply on the 9* of February 2023, the 
systematic bias In the RFI detection metric had dissappeared. Also thanks to the update of the 
FPGA and C++ code of the Demonstrator 2, the use of Galileo E1-B signals became possible. 
Title: Final Report 
Version: 1.0 
age: 64
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.