Final Report of BeJamDetect Project
Time evolution of PRNs in PVT and in track
„|
ULM
3 F ;
a|
W
3
A
Aa
N 2 3
14-Jan
UTC time
I
“
A
ya.
Il
wahr
7
Jal
we
— sed for PVT
— tracked, GPS L1-C/A |
tracked. GA =1-BR
1 *
‚an
2022-2023
Figure 4-42: Number of GPS L1-C/A signals being tracked and used for PVT, January 2023
Time evolution of mean CNO values
GPS | 1-C/A
DAL E1-B
50
15
r
340}
)
35 L
un
IE
37-.1an
14-Jan
UTC time
21-.lan
28-Jan
2022-2023
Figure 4-43: Mean C/NO value for GPS L1-C/A signals, January 2023
4.1.5. Interference situation in February 2023
The selected test metrics are presented in Figure 4-44, Figure 4-45 and Figure 4-46. The time
periods with increased interference activity are marked in Figure 4-44 with red boxes.
After the fixing the issue with the failed 5V power supply on the 9* of February 2023, the
systematic bias In the RFI detection metric had dissappeared. Also thanks to the update of the
FPGA and C++ code of the Demonstrator 2, the use of Galileo E1-B signals became possible.
Title: Final Report
Version: 1.0
age: 64