Skip to main content

Full text: Standard

Part B - Certificates and approval requirements 
27 
Temporary closures and restrictions 
Prohibited areas and protection zones 
Shipping and aviation 
Installation procedure at the installation site and 
Access system to the structures 
• Certificate for floating equipment 
All significant floating equipment involved in the operations shall be certified/approved for operation. 
This can be in the form of a class approval or a special permit. 
• Certification for crane and lifting equipment 
Lifting equipment and facilities including all crossbeams, lashing cables, hooks and other ancillaries 
required for installation shall be of sufficient size and tested. Instructions and documents relating 
to installation and handling shall be provided by the manufacturer. All lifting equipment, cables and 
hooks shall be checked and confirmed for the permitted load. All floating units within a class shall 
be covered by a crane manual that is updated in accordance with the regulations. 
• Certification for transport and installation materials 
Certification of the transport and installation materials includes the precise specification of the 
identification features required for the product as well as transfer and positioning. These include, 
amongst other items: 
Designation of the structure and assignment to the installation location 
Manufacturer, supplier, importer 
Designation, type 
External dimensions of all types 
Water depth at the installation site 
Rated power, rotor diameter, hub height 
Requirements for sea transport and installation 
Designation and dimensions of all significant components with the information required for 
installation 
Lashing points, lashing devices 
• Procedural instructions 
The instructions issued by the manufacturer for safe installation or erection shall be followed. The 
following points shall be taken into account, amongst others: 
Special tools 
Tensioning devices 
Attachments and lifting gear 
Transport protection devices 
Lubrication and service instructions 
• Inspection/certification of weather conditions 
Weather conditions and forecasts shall be monitored regularly, in particular before major work or 
work which will continue uninterrupted for long periods. At least two independent weather services 
shall be involved. 
• Certifications of product quality 
The components and accessories shall be specified in accordance with the manufacturer's data. The 
quality shall be demonstrated by checking the supplied products and the manufacturing procedures 
for the products in accordance with the specifications, and includes at least the following points: 
Material certificates 
Delivery notes 
Correct installation conditions 
Lifting devices 
Cable and bending roller diameters
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.