42 
Part В - Verifications and approval requirements 
DIN EN ISO 19905-1 
ISO/DIS 29400 
DIN EN 1990 
DNV-OS-H101 
GL-IV-7 
Petroleum and natural gas industries - Site-specific assessment of 
mobile offshore units - Part 1 : Jack-ups 
Ships and marine technology - Offshore wind energy - Port and ma 
rine operations 
Basis of structural design 
DNV Offshore Standard - Marine Operations, General 
GL Rules for the Certification and Construction, IV Industrial Services, 
Part 7 Offshore Substations 
GL-IV-6 
API RP 2A-WSD 
GL-IV-2 
GL Rules for Classification and Construction, IV Industrial services, 
Part 6 Offshore Technology 
American Petroleum Institute, Recommended Practice - Planning, De 
signing, and Constructing Fixed Offshore Platforms - Working Stress 
Design 
GL Rules and Guidelines, IV Industrial Services, Part 2 Guideline for 
the Certification of Offshore Wind Turbines 
DNV-OS-J101 DNV Offshore Standard - Design of Offshore Wind Turbine Structures 
DNV-OS-J201 DNV Offshore Standard - Offshore Substations for Wind Farms 
Deviations from the German and international standards and guidelines listed above shall be 
submitted to the BSH for approval. 
Should a machine be used outside its normal field of application for offshore activities, the 
suitability of this machine shall be verified and certified in accordance with the German Ma 
chine Ordinance. 
The special codes of practice to be observed with respect to monitoring the production phase 
are listed in chapter B2.4.2 ff. 
2.4.2 Requirements and required verifications 
All equipment, procedures and materials used in offshore work shall comply with the German, 
resp. European standards, provisions and similar with respect to safety, environmental protec 
tion etc. 
Where equipment, procedures or materials are used that are not in compliance with a recog 
nised standard, appropriate approval shall be obtained from the approval authority. To this 
end, the approval authority may appoint a suitable expert to carry out this inspection, resp. 
recognise verifications provided by third party experts. Should a machine be used outside its 
normal field of application, the suitability of this machine shall be verified in accordance with 
the German Machine Ordinance. 
Copies of the installation manual shall be available for review at all times - with a minimum of 
one copy in the construction management’s marine office and one at the land base, as well as 
copies at all other locations deemed suitable. 
The applicant shall provide evidence that an effective, certified management system in ac 
cordance with ISO 9001, Quality management systems - Requirements, is in place. Alterna 
tively, should this certification not be currently available, the quality management system can 
be inspected on the basis of ISO 9001 by the appointed inspector.
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.