Full text: Standard ground investigations

Part A - Introduction 
7 
Table 1: Steps involved in geological and geotechnical surveys and investigations as well as 
all reporting. Stages 1 to 4 are the development phase, stage 5 is assigned as the construc 
tion phase within the context of Standard Design (see also Table 2). 
Phase 
Stage 
Geological survey 
Geotechnical 
survey 
Report 1 
Development 
1 
Desk Study 
Preliminary geological report, 
“Geologischer Vorbericht” (con 
tent reflects the geological 
report) 
2 
Geophysical investiga 
tions 
3 
Preliminary ge 
otechnical in 
vestigation 
Preliminary geotechnical site 
survey report, “Baugrundvor 
untersuchungsbericht” 
Soil and foundation expertise re 
port (Development phase), „Bau 
grund- und Gründungsgutachten 
(Entwicklungsphase)” 
4 
Geophysical postinter 
pretation including the 
results of geotechnical 
survey 
Geological report, “Geologischer 
Bericht” 
(Findings from 1 to 4) 
Construction 
5 
Main geotech 
nical investiga 
tion 
Main geotechnical site survey 
report, „Baugrundhauptunter 
suchungsbericht” 
Soil and foundation expertise re 
port (Construction phase), “Bau 
grund- und Gründungsgutachten 
(Konstruktionsphase)” 
The soil and foundation expertise report in the development phase („Baugrund- und Griin- 
dungsgutachten (Entwicklungsphase)”) contains mainly an assessment of the foundation 
which is based on current investigation findings which refer to the method applied and the 
variants that were designed. 
The preliminary geotechnical site survey report (“Baugrundvoruntersuchungsbericht”), soil 
and foundation expertise (development phase) („Baugrund- und Grundungsgutachten (Ent 
wicklungsphase)”) and geological report (“Geologischer Bericht”) are the rudiments for the 
design basis and the preliminary design. These must be presented to the Federal Maritime 
and Hydrographic Agency in accordance with the specifications in the Standard Design in a 
verified format for the first release. 
The findings of the geological report are to be integrated into the geotechnical site survey re 
port. Together with the soil and foundation expertise (construction phase) („Baugrund- und 
Grundungsgutachten (Konstruktionsphase)”) it is part of the rudiments of the basic design. 
These supporting documents must be presented to the Federal Maritime and Hydrographic 
Agency in accordance with the specifications in the Standard Design in a verified format for 
the second release. 
Part C, Section 2.3.3 contains differing regulations for offshore stations. 
See part B, section 7 for the contents of the geological report, see part C section 4 for the contents of the geo 
technical site survey report and the soil and foundation expertise.
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.