Volltext : Standard ground investigations

Part  A  -  Introduction

11

Methods  of  carrying  out  geotechnical  surveys  and  investigations  can  be  divided  into  the  following ­
  groups:
•  geophysical  and
•  geotechnical  investigation  methods.
Geophysical  methods  are  indirect  methods  (sonars,  seismics,  echosounding  equipment,  etc.).
Geotechnical  methods  comprise  field  and  laboratory  studies.  Field  investigations  consist  of
direct  exposure,  primarily  to  recover  sediment  samples  (boreholes)  and  indirect  exposure
(probes)  as  well  as  field  tests  such  as  manual  vane  tests  or  pressiometric  tests  in  the  borehole. ­

It  may  be  expedient  to  carry  out  further  investigations  to  aid  planning  such  as  e.  g.  pile  driving
or  pile  load  tests.  Carrying  out  pile  load  tests  in  the  construction  phase  as  part  of  verification
of  bearing  capacities  (execution  phase)  is  regulated  in  the  Standard  Design.
Sediment  characteristics  are  deducted  as  part  of  laboratory  or  field  tests  in  exceptional  circumstances, ­
  or  derived  from  field  investigations.  The  type  and  the  scope  of  such  surveys  and
investigations  for  individual  project  phases  are  illustrated  in  Table  2.
The  concept  illustrated  in  this  guideline  defines  the  minimum  scope  of  geotechnical  surveys
and  investigations  in  general  cases.  This  is  specified  in  Part  B  and  Part  C.

4  Geotechnical  expert
Guidelines  for  geotechnical  experts  (Sachverständige  für  Geotechnik)  in  DIN  EN  1997  along
with  the  supplementary  guidelines  in  DIN  1054  and  DIN  4020  have  been  refined  and  adapted
for  offshore  structures  as  follows:
For  planning  and  carrying  out  geotechnical  surveys,  investigations  and  assessments,  the  applicant ­
  or  approval  holder  must  ensure  that  even  in  the  development  phase  (in  accordance
with  Part  A,  Table  2)
•  a  suitably  qualified  and  independent  geotechnical  expert
•  with  documented  experience  in  such  complex  construction  projects
has  to  be  involved.  This  measure  should  ensure  that  the  soil  is  recorded  as  a  non-normative
part  of  the  supporting  structure  with  regard  to  size  and  scope  in  accordance  with  accepted
technological  standards  and  taken  into  account  in  plans  and  during  implementation.
The  geotechnical  expert  acts  on  behalf  of  the  applicant  or  approval  holder  and  is  responsible
for  geotechnical  surveys,  investigations  and  assessments  which  are  part  of  the  planning  basis
for  the  objects  of  the  construction  project.  The  expert’s  tasks  individually  arise  from
DIN  4020.
The  geotechnical  expert  correspondingly  develops  the  geotechnical  planning  basis  for  the
construction  project  for  the  applicant  or  approval  holder.  The  expert
•  plans  the  preliminary  geotechnical  survey  and  the  main  geotechnical  survey,
•  accompanies  the  execution  of  the  preliminary  geotechnical  survey  and  the  main  geotechnical ­
  survey,
•  develops  the  geotechnical  site  survey  reports  in  accordance  with  Part  C,  Section  4.2,
•  develops  the  soil  and  foundation  expertise  in  accordance  with  Part  C,  Section  4.3,
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.