8
Sy, A. et al. (2002): Upper Ocean Climate Ship-of-Opportunity Programme of BSH - A Status Report
Table. 1: Status of existing SOOP lines operated continuously by BSH
TWI #
AX-3
AX-11
Start of operation
May 88
1981/June 90
Co-operating vessels
Köln Express/Bonn
Cap Finisterre
Call sign
Express/Gauss
9VBL/DGNB/DBBX
DACF
Mode
high density (HDX)
frequently repeated (FRX)
Frequency (sections)
8/year
7/year
Density (drops)
12/day
6/day
Probe type
Sippican Fast Deep/T-5
Sippican Deep Blue
Equipment
SEAS IV, MK-12
SEAS IV, MK-12
Real-time data transmission
METEOSAT
METEOSAT
Agency
BSH, Hamburg
BSH, Hamburg
Programme
GOOS/CLIVAR
GOOS
QC of delayed mode data
yes
yes
Sections 2000/2001/2002
8 117
6 7 9
Profiles 2000/2001/2002
595 737 510
309 395 510
GTS Input 2000/2001/2002
435 717 505
301 378 508
Sections planned in 2003
8
6
Problems 2000/2001/2002
none
10.99-04.2000:
Remarks
1 XCTD section in 2000
2 CTD sections (hydr. box)
each in 1998, 2000, 2002
by RV Gauss
bad probe quality
Fig. 3: Number of XBT profiles obtained along AX-3 and AX-11 from 1988 until 2002.
The decrease for AX-3 in 1999 and AX-11 in 2000 is caused by wire related
probe failures.